This project would replace Memorial Park's existing waste water treatment plant (WWTP) facility and septic system with a new WWTP located at an overflow parking lot, approximately 150 feet southeast from the existing WWTP site. The existing WWTP would be repurposed as a lift station. The collection system would also be improved by repairing and replacing select pipe sections and manholes throughout the system. The collection system repairs would be implemented to fix structural defects, lessen infiltration and inflow.
Project timeline is forthcoming. Check back soon.
Contact
Scott Lombardi, Park Superintendent
slombardi@smcgov.org
Old waste water treatment plant
Wednesday, March 13, 2019
Per CEQA requirements, the Draft Initial Study / Mitigated Negative Declaration (IS/MND) for this project has been posted with the project documents. Comments on the adequacy of the Draft IS/MND will be accepted from March 12 to April 11, 2019 at 5pm, and should be sent to Gilles Tourel, Principal Civil Engineer at DPW_Memorialparkproject@smcgov.org.